Skip to content

Careers

  • English
    • العربية
  • English
    • العربية
  • Home
  • About Us
    • Company Overview
    • Subsidiaries
    • Strategy
    • Clients
    • Corporate Governance
  • Solutions
    • Water
    • Environment
    • Energy
    • Technology
    • Infrastructure & Social Infrastructure
  • Projects
    • Public-Private Partnerships
    • Operations & Maintenance
  • News
    • Media Center
    • Gallery
  • Contact
Menu
  • Home
  • About Us
    • Company Overview
    • Subsidiaries
    • Strategy
    • Clients
    • Corporate Governance
  • Solutions
    • Water
    • Environment
    • Energy
    • Technology
    • Infrastructure & Social Infrastructure
  • Projects
    • Public-Private Partnerships
    • Operations & Maintenance
  • News
    • Media Center
    • Gallery
  • Contact
  • English
    • العربية
  • English
    • العربية

News Article

Home > Mowah’s Subsidiary Wins Al Aweer (Warsan) STP Solar Dryer Project in Dubai

Mowah’s Subsidiary Wins Al Aweer (Warsan) STP Solar Dryer Project in Dubai

Mowah’s subsidiary – CICLO was selected by the Dubai Municipality  Sewage Treatment Plants and Networks Department  as the  EPC and O&M Contractor  for the EPC of the solar dryer covering and operation and maintenance of the Al Aweer (Warsan) STP sludge drying plant. The EPC scope included engineering (design), procurement, and construction (EPC) of a complete covering for the solar drying beds and equipping the facility with odor treatment to mitigate odorous emissions (zero odor) for 10 or 20 years. The facility is required to be operated at its full capacity while the construction is ongoing.

The Al Aweer (Warsan) STP Solar Dryer is located in Warsan, Dubai, UAE and has a footprint area of 29,000 m2. It has 16 solar drying beds with a total design capacity of 250 – 350 tons/day. The solar drying facility is currently operating at only half its design capacity to avoid odorous gas emissions and nuisance to the surrounding community. CICLO’s proposed solution aims to treat odor and meet the KPI target of zero complaints.

The project was procured by the Dubai Municipality through competitive bidding. The O&M contract period with CICLO for the odor treatment of the solar drying plant is initially for ten (10) years and can be extended depending on the mutual agreement of Dubai Municipality and the Contractor.

Next
Prev

Riyadh Head Office
Al Yasmin District
Riyadh, Kingdom of Saudi Arabia
Tel: +966 92 000 9560
Email: info@mowah.com
www.mowah.com

Company

  • About Us
  • Solutions
  • Projects
  • Careers
  • News & Media
  • Contact
  • About Us
  • Solutions
  • Projects
  • Careers
  • News & Media
  • Contact

Connect

Facebook-square Linkedin

Mowah Company 2023. All Rights Reserved

Powered By Konvergense

Privacy Policy.

  • Home
  • About Us
    • Company Overview
    • Subsidiaries
    • Strategy
    • Clients
    • Corporate Governance
  • Solutions
    • Water
    • Environment
    • Energy
    • Technology
    • Infrastructure & Social Infrastructure
  • Projects
    • Public-Private Partnerships
    • Operations & Maintenance
  • News
    • Media Center
    • Gallery
  • Contact